Edtech SaaS grows from 1 DevOps engineer to 6 specialists

Brocoders began with AWS scaling for 99math’s math game platform, then added front-end and back-end engineers to its team.

Industry
Edtech
Location
Estonia
Client since
July 2022
Status
Finished
1 to 6
1 DevOps engineer at the start, 6 engineers at the peak
731
skills in 28 topics, grades K to 8 (99math.com, October 2026)
2022
July 2022 to May 2025 with Brocoders
4M+
4 million+ students in the USA (the client’s own figure)

Client: 99math, ed-tech SaaS company, Estonia. Client contact: Ain Arend, co-founder and CTO.

Picture a classroom at ten past nine. A teacher puts a code on the board, thirty kids type it in, and for the next five minutes the room goes quiet except for the tapping. Then someone shouts that they got the answer first. That is 99math, an ed-tech SaaS company with a live, multiplayer math game that turns a lesson warm-up into a race the whole class wants to win.

It began in Estonia in 2018, and by January 2019 more than 9,000 students from 200 schools had played in a single game day. Today the team says over 4 million students in the USA play it, and many keep playing at home for fun. Teachers get live games, self-paced practice, homework and reports for free. Students get 731 skills across 28 topics, from addition to fractions, decimals and integers, for grades K to 8.

The teacher's board in a live game: the game code, and the class avatars as students join
A live game on 99math.com: the teacher's board shows the game code, and the class joins with it.
The class progress report: accuracy by topic and each student's weakest skill
The class progress report on 99math.com: accuracy by topic and each student's weakest skill.

Ain Arend, the company's co-founder and CTO, describes the goal on LinkedIn as building a platform where millions of kids actually want to do math. In summer 2022 that goal had a deadline: the school year.

Why 99math needed more engineers in summer 2022

A platform that millions of kids want to play has a good problem. Every autumn, school starts and traffic arrives all at once. 99math had a lean team and a long list of things to build, including more math topics than first planned.

In June 2022 a fellow Estonian founder, the team behind Adact, introduced Ain Arend to Brocoders. We had built a gamification platform for Adact, and 99math wanted engineers who could work on their own inside a live product and keep up with the 99math team's pace.

Where we started: DevOps and AWS, ready for the school season

The engagement began with modernizing 99math's AWS setup so it could carry school-season load with room to grow. One DevOps engineer from Brocoders joined the 99math team in July 2022.

The client's review on Clutch, titled “App Development for Ed-Tech SaaS Company”, describes it this way:

Ain Arend, co-founder and CTO of 99math

“We initially started with just DevOps from BC. Then we got an additional FE developer, and now we have 6 engineers. 3 FE, 2 BE, 1 devops.”

Client review on Clutch, 5.0, Nov. 1, 2022
Read the review on Clutch

Clutch's summary of the project: Brocoders has supported the development of an app for an ed-tech SaaS company.

New math exercises in the existing Topics API

Next came a front-end developer. 99math already had a Topics API behind its Vue.js teacher side, and the work was to add new kinds of math exercises and new ways to present math tasks to students.

The Multiplication tables skill list in the setup, with Multiply by 6 or 7 picked

1. Choose the skills

A student's screen in a live round: 1 plus 9, answered with the calculator

2. Play a live round

The class progress graph: students placed as fast and accurate, accurate but slow, fast but inaccurate, or slow and inaccurate

3. See who needs help

How a round works on 99math.com: the teacher picks skills from the topics, the class plays, and the report shows who needs help.

From one engineer to a team of six

Once the first two engineers delivered, the team grew in steps. By the autumn season 99math had six Brocoders engineers working as part of the 99math team: three front-end, two back-end and one DevOps. This is the main thing we did for 99math, and it is what our senior engineering pods are built for: engineers placed into a client's own team, in the client's repo, on the client's plan, with the client leading.

The Brocoders team on 99math, autumn 2022

  • DevOps engineer

  • Front-end developers

  • Back-end developers

Ain Arend, co-founder and CTO of 99math

“They are very well organized, communicate well, and keep deadlines.”

Client review on Clutch, same review as above
Read the review on Clutch

How the team changed over three years

The team was sized to the season and the roadmap. Six engineers at the 2022 peak, a stable core of two from mid 2023, and a short front-end cover in autumn 2024 when the roadmap needed extra hands. In 2025 99math started building its student game in Unity with its own in-house team, and our work was handed over in May 2025. A product team that grows its own engineering capacity is the best outcome a partner can hope for.

What 99math has done since

According to Ain Arend's LinkedIn, 99math moved its student game to Unity and kept the teacher side in Vue. In September 2026 Ain reported almost 17,000 kids playing in a five-minute window.

A practice question, 42 plus 96, with the calculator

A practice question

The squad world, where the class meets between rounds

The squad world

The pet editor, dressing a pet called Loomi

The pet editor

Student game screens on 99math.com, October 2026.

More on this work: edtech case studies and edtech development services.

If your platform is already working and needs more hands before a deadline, Brocoders places senior engineers into your team within weeks and adjusts the size monthly.

Need engineers for a live product?

See how engineering pods work

Want to develop something similar?

We are thrilled about the opportunity to provide software development services for your business

Rodion Salnik

Rodion Salnik

CTO and Co-founder at Brocoders

Pick a date that works for you to see available times to meet with me and discuss your project needs. Looking forward to meeting you!

Book a call