Brocoders has built products from scratch for 12 years, so the architects reading your code already know what a scalable, secure and maintainable system looks like. We investigate the codebase and present the findings, what can be kept and what has to be rebuilt with the cost of each, and you make the call.
- 80x
- more connected properties on Lake, from about 500 to 40,000, after we split its WordPress monolith
- 23%
- of our delivered client engagements were takeovers or modernizations of software the client already ran
- 5x
- faster deployment at Traders Alloy, after we took over the pipeline the previous vendor could not finish
- 8 years
- longest live engagement still running, since June 2018
Named in the 23%: CondoGenie, Lake, HeyPractice, Adact, Beyond Green, and Traders Alloy.
This service is for you if
Customer-facing software is outdated
A competitor has shipped a newer experience, your portal is not usable on a phone, and workflows that took 3 clicks at launch now take 11. Support spends its day answering navigation questions.Solution
Condogenie case study →- Rebuild the interface module by module, each area released on its own date, with the existing backend serving throughout
- Ship a design system with tokens, components and states, so the next 5 years of screens stay consistent
- Meet WCAG, which enterprise procurement now asks about alongside SOC 2
Proof
We re-engineered the condo management platform by redesigning the UX, adding the features our users were asking for, and migrating every account off the old system with its data intact. 1,398 active users in 2019 became 19,324 in 2025.
Your operation runs on software your team works around
Releases are slow and risky
Solution
- Rebuild the interface module by module, each area released on its own date, with the existing backend serving throughout
- Ship a design system with tokens, components and states, so the next 5 years of screens stay consistent
- Meet WCAG, which enterprise procurement now asks about alongside SOC 2
Proof
We re-engineered the condo management platform by redesigning the UX, adding the features our users were asking for, and migrating every account off the old system with its data intact. 1,398 active users in 2019 became 19,324 in 2025.
Solution
- Audit first. You get the dependency graph, the data model and the key-person map before anything moves
- Reproducible builds, CI/CD, monitoring and a regression test suite, so the system can be changed safely
- Migrate the modules the business cannot lose onto a stack you can hire for, replacing the manual steps as each one moves
Proof
SafeRacks asked us to architect a new operational platform to replace their patchwork legacy system; our discovery specified how it would bring cancellations from 20% down to their 10% target.
Solution
- Raise test coverage on the critical paths first, then upgrade one version at a time, each as its own release
- Build the pipeline and the environments: reproducible builds, CI/CD, staging, monitoring, and test reports the team can read
- Release with zero downtime and a rollback path, with feature delivery continuing throughout
- Decompose the modules that cannot be changed safely, in the order the audit sets
Proof
We've built the CI/CD pipeline with automated testing for Traders Alloy instead of their manual deployments, making releases 5x faster and letting them ship 66.6% more features.
The Software Audit
5 or 10 business days. Fixed scope. Essential $5,000 or Standard $9,900. You get a written recommendation with an estimate attached, and it is permitted to say do not rebuild.
Book the auditWhat modernization produced, in numbers
Four stages, and you can stop after any of them
1. Software Audit — 5 or 10 business days, fixed scope, Essential $5,000
Architecture map, dependency graph, security and data review, test coverage assessment, prioritised risk register, refactor-versus-rebuild recommendation with an estimate. Standalone. Yours to take anywhere.
2. Stabilisation Sprint — 30 to 90 days, fixed scope
Reproducible builds, CI/CD, monitoring, backups, credential and account transfer, a minimum regression-test safety net. Behaviour does not change in this stage; the ability to change it safely does.
3. Incremental decomposition — ongoing, monthly
Module by module, ordered by what breaks the business soonest. Product delivery continues throughout. Traffic moves to a new module only after it proves itself.
4. Modernization Pod — ongoing, monthly
Feature delivery on the modernized platform against published delivery KPIs, with senior engineers you interviewed yourself. About 60% senior.
Roughly $40,000 to $120,000 for stabilisation, and $25,000 to $60,000 a month for a decomposition pod. Published so you can decide whether to have the conversation.
What is yours, from day one
- Repositories. In your organisation, not ours.
- Cloud tenancy. Your AWS, GCP or Azure account, your billing, your root access.
- Credentials and third-party accounts. Transferred in the stabilisation sprint, before behaviour changes.
- Documentation. Written as we go, in your repository. When ShineUp's acquirer needed the platform stood up, they got the deployed apps, a verification walkthrough, documentation and 30 days of support for a fixed 1,000 EUR over 2 to 3 weeks.
- Every audit artifact. Including the right to take it to another vendor.
Where modernization goes next
Project takeover
Software audit
AI product development
Product development
Send us the system, the constraint, and the deadline somebody else set. In 5 or 10 business days you will have a written recommendation with a module-level estimate attached, and it is allowed to say keep it.
Start with an honest answer about what you already have
Diagnose your projectThe stacks we inherit
We take over systems written in these. If yours is here, we can read it, run it and rebuild it.
JavaScript and TypeScript
JS monoliths are our core, and our boilerplates are the upgrade destination.
Ruby and Python
Rails 7.0, 7.1 and 7.2 all went unsupported inside 16 months, and the dual Ruby plus Rails upgrade is harder than either alone. Python and FastAPI backends taken over too.
Data
PostgreSQL, MySQL, Azure SQL and pgvector, with the schema kept wherever it is sound.
Cloud and delivery
Your tenancy, your billing, reproducible builds and a pipeline your own team can run.
Payments and integration
Stripe, Xero, REST, MQTT and MCP, including the integrations nobody documented.
What we do not take on
Java and Spring. Mainframe, COBOL, VB6. We do not staff these and we will not learn them on your project. If that is your stack, we will say so on the call and point you to a firm that does it well.
What can go wrong, and what we do about each one
The audit picks the first one on how isolated it is. If the estimate moves more than 20%, we stop and re-sequence with you.
Both paths run against the same requests before traffic moves, and the old one stays deployable for 30 days.
Migration and feature capacity are tracked and reported separately.
Documentation goes into your repository as the work proceeds, and every module is worked by at least 2 of our engineers.
Each module and each version is a complete unit. What is migrated stays migrated and keeps running.
You hear that on the discovery call, before you pay.
Schedule a call or send us a message
We are thrilled about the opportunity to provide software development services for your business

Rodion Salnik
CTO and Co-founder at Brocoders
Pick a date that works for you to see available times to meet with me and discuss your project needs. Looking forward to meeting you!