New service built end to end

iFit is the connected-fitness company behind NordicTrack, ProForm and Freemotion equipment. Its subscription platform streams trainer-led classes and global routes to connected treadmills, bikes, ellipticals and rowers, and by August 2021 iFit reported over 6.1 million members in more than 120 countries.

From February 2021 to March 2022, a Brocoders team of senior Node.js developers worked inside that platform. It owned iFit's backlog of vulnerability and bug tickets and built new services for iFit's move from a monolith to microservices. Another Brocoders team built iFit's integrations with Apple Health, Strava, Garmin and Google Fit, described in its own case study.

iFit at a glance

Client
iFit (formerly ICON Health and Fitness), Logan, Utah, USA
Product
Connected-fitness subscription platform for treadmills, bikes, ellipticals and rowers
Scale
Over 6.1 million members in more than 120 countries (August 2021)
Engagement
A Brocoders-run team inside iFit's live platform, beside iFit's own engineering teams
Domain
The vulnerability and bug backlog, and new services, Feb. 17, 2021, to March 2022
Team
A team lead, 3 senior Node.js developers (4 from February 2022), a QA engineer and a PM
Stack
Node.js, JavaScript, TypeScript, PostgreSQL, AWS
How iFit found us
Google search and reviews, then an interview with the team
Ramp-up
Independent work in under two weeks
Result
60% of vulnerability path tickets handled in 2 to 3 months

The situation: two programmes on a live iFit platform

In early 2021, iFit had two pieces of engineering work running on its live platform, and our team took part in both.

The first was a backlog of vulnerability and bug tickets in iFit's existing JavaScript and Node.js codebase, which Brocoders had not built. Our team started on it on Feb. 17, 2021.

The second was iFit's move from a legacy monolith to microservices. In the view of our team lead, the platform had grown so large and interlinked that a change in one part could affect another. iFit had decided on the move before we joined, and its own team had already moved the first and largest piece: the base functionality the rest of the platform relied on. Our team joined that programme and took on services that sat to one side of the core.

iFit's VP of Engineering at the time, Brad Kramer, later summed up the programme on LinkedIn: "My teams re-platformed the connected fitness platform from VMs to containerized microservices, cutting cloud costs 50%."

The iFit vulnerability backlog

The tickets covered security issues and bugs. In its first 2 to 3 months, our team handled 60% of iFit's vulnerability path tickets. iFit then kept the team on, and it worked through the backlog until March 2022.

Fixing security issues and bugs in a live codebase is part of our application modernization work.

Michelle Bowser, iFit
5.0

“For the bug fixing, we had all the tickets written up and assigned a few of our team leaders internally to help them ramp up. Within less than two weeks, they were jumping right in and working independently.”

Read full review on Clutch
Michelle Bowser
Director of Technical Operations, iFit

Extracting services from iFit's monolith

Moving a function out of a live monolith carried five risks, and the team planned for each.

  • Risk 1

    Members on the site during the move

    Members had to keep using the platform while a function moved out of the monolith.

    Solution

    The team planned the data migration and data compatibility before each switch.
  • Risk 2

    Data lost if the new service failed

  • Risk 3

    Members noticing a difference

  • Risk 4

    A circular dependency

  • Risk 5

    A monolith under continuous change

Members had to keep using the platform while a function moved out of the monolith.

Solution

The team planned the data migration and data compatibility before each switch.

How the team moved a service out of iFit's monolith

  1. Map

    Work out how the function behaves in the monolith today.

  2. Wrap

    Put a wrapper over the function's current data provider, such as a database, and design the new service's database.

  3. Switch

    Point the wrapper at the new service.

  4. Adapt

    Change the old application to work with the new service.

The team built one service end to end this way, and part of a second.

Our team: the second Brocoders team at iFit, 2021 to 2022

The team arrived already working together and joined iFit's process, which is how our senior engineering pods work.

  • Team lead

  • Senior Node.js developers (3, then 4)

  • QA engineer

  • Project manager

  1. Feb. 17, 2021

    A team lead, two senior developers and a PM start on the backlog.

  2. March 2021

    The team works independently, and a third senior developer joins.

  3. April 2021

    A QA engineer joins.

  4. 2 to 3 months in

    60% of the vulnerability path tickets are handled.

  5. February 2022

    A fourth senior developer joins.

  6. March 2022

    The team finishes its work for iFit.

Michelle Bowser, iFit
5.0

“Having team composed and ready for us that already knew how to work together set them apart for me. We've had a few staff augmentation teams, but we can rely on them because of how they work together.”

Read full review on Clutch
Michelle Bowser
Director of Technical Operations, iFit

Questions about security backlogs and microservices on a live product

iFit led its move to microservices. Our team built one service end to end and part of a second, and adapted the old application to work with them.

In the view of our team lead on the iFit project, when the expected load is high and the functions can be separated. Self-contained jobs move out cleanly, such as sending email, SMS or push notifications, or a background task that runs a few times a day. A dashboard that groups data from many entities, or an entity tied to many others, is hard to split. Moving a monolith is slow and expensive, so a software audit should come first. More in our monolith vs microservices guide.

Optimizing what is already there: rewriting inefficient queries, returning only the data a screen uses, and scaling the server up or out as a short-term fix. Another path is to keep the monolith and build new features as separate services.

Yes, if only part of the functionality moves at a time. Part of the team moves functions, and the rest ships features and fixes. Moving everything at once pauses the product, and splitting the work across two teams that touch the same code makes the move longer.

At iFit, data went to both the monolith and the new service at the start, so the platform could fall back to the monolith if the new service failed. The team also planned the data migration and its compatibility before each switch.

At iFit, in under two weeks, with the tickets written up and iFit's team leads helping the engineers ramp up. In its first 2 to 3 months, the team handled 60% of the vulnerability path tickets.

Node.js, JavaScript, TypeScript, PostgreSQL and AWS. See our Node.js development services.

More modernization work

Want to develop something similar?

We are thrilled about the opportunity to provide software development services for your business

Rodion Salnik

Rodion Salnik

CTO and Co-founder at Brocoders

Pick a date that works for you to see available times to meet with me and discuss your project needs. Looking forward to meeting you!

Book a call